What should be paid attention to when PP pipe is used in construction?
2023-06-27
What should be paid attention to when using pp pipe construction? As a kind of special plastic pipe, because of its perfect performance, it is mostly used in building cold and hot water discharge and switching system in life. So what should we pay attention to in the process of using pp pipe?
1, first of all, if the pipe is the device in the outdoor, because if a long time by direct sunlight, it will easily lead to material aging degradation, thus affecting the quality of use, so remind the construction personnel to bandage dark protective layer, in order to play a protective role. In addition, during transportation, in order to avoid product damage caused by external forces, it is necessary to do a good job of protection.
2. The linear expansion coefficient of pp pipe is relatively large. When the pipe is installed or not directly buried, appropriate measures must be taken to prevent it, and supports and hangers must be installed. And the installed pipeline can not be heavy pressure, knock, if necessary, the parts vulnerable to external force cover protection. If it is dark, pay attention to mark the specific location of the pipeline, so as not to damage the pipeline in the later secondary construction.
3. After the construction is completed, the pressure test shall be carried out before sealing the pipe and covering the decorative layer. The pressure test of cold water pipe shall be 1.5 times of the working pressure of the switcher, but shall not be less than 10MPa. Hot water pipe test pressure is 2 times the working pressure, but not less than 1.5MPa. Pressure test time and method technical regulations.
2. The linear expansion coefficient of pp pipe is relatively large. When the pipe is installed or not directly buried, appropriate measures must be taken to prevent it, and supports and hangers must be installed. And the installed pipeline can not be heavy pressure, knock, if necessary, the parts vulnerable to external force cover protection. If it is dark, pay attention to mark the specific location of the pipeline, so as not to damage the pipeline in the later secondary construction.
3. After the construction is completed, the pressure test shall be carried out before sealing the pipe and covering the decorative layer. The pressure test of cold water pipe shall be 1.5 times of the working pressure of the switcher, but shall not be less than 10MPa. Hot water pipe test pressure is 2 times the working pressure, but not less than 1.5MPa. Pressure test time and method technical regulations.
pp pipe,plastic
RELATED INFORMATION
Several Considerations for Selecting High Temperature Hose
High temperature hose is used in high temperature water vapor, oil, chemicals, air and various liquid transfer pipe. In the industrial field, many manufacturing processes require the use of high-temperature hoses, including metallurgy, automotive, paper, casting and other industries. Because the liquid or gas to be transferred must operate in a high temperature environment, it is important to choose the right high temperature hose. When choosing a high temperature hose, the following factors need to be considered:
2023-05-10
How to repair the PE pipe after damage? The method is as follows
PE pipe in the production process due to the impact of the environment, may cause some defects on the surface, the more common is the surface roughness or scratches. There are many reasons for this defect, so there are many corresponding repair methods. If it is found that the surface of the PE pipe is rough, it may be caused by the high or low temperature of the host head. For example, when the temperature of the core mold is low, the body temperature is too low to cause the surface roughness; the cooling water temperature is too high to cause the surface roughness. In this development situation, the cooling water temperature should be appropriately reduced. At the same time, we should also check whether there is blockage and insufficient water pressure in the waterway. And check the heating ring, raw material production performance, etc.
2023-05-10
How to connect PE pipe with metal pipe and valve fittings?
The bolts on the flange plate are fixed with metal pipes such as PE pipes connected by flanges, which is not only easy to operate, but also short in construction period. Flange connections are mainly used to connect PE pipes to metal pipes or valves, flow meters, pressure gauges and other auxiliary equipment. Flange connection is mainly composed of PE injection flange, steel or aluminum flange, gasket or sealing ring, bolt and nut. Flange connection is the process of tightening bolts and nuts from beginning to end, so that the flange joint is in close contact with the flange parts. PE pipes can be connected to other metal pipes.